Section 1: building on the boundary line

When you need a line of junction notice, how much notice to give, and what happens next.

By Guy Crouch MRICSReviewed 3 November 2026
Detached brick house next to its neighbour
Photo: James Feaver / Unsplash

In short

Serve a Section 1 notice at least 1 month before building a new wall on or astride the boundary (the line of junction) where there isn't already a wall there. A wall astride the boundary needs your neighbour's written consent. A wall wholly on your own land, up to the boundary, doesn't need consent, but you must still serve notice.

When Section 1 applies

Section 1 covers new walls built at the line of junction, the legal boundary between two properties, where that boundary isn't already built on (or only has a boundary wall that isn't a party fence wall or the outside wall of a building). Typical examples:

  • A single-storey rear or side extension with its flank wall built right up to the boundary
  • A new detached garage or outbuilding built against the boundary
  • A new masonry garden wall along the boundary
  • A new house or commercial building on a plot that adjoins another owner's land

The two types of Section 1 wall

Type of wallNeighbour's consent needed?Who pays
Astride the boundary (a new party wall or party fence wall)Yes, in writing. Without consent within 14 days you can only build on your own landShared in proportion to use, if the neighbour agrees to the wall
Wholly on your own land, up to the boundaryNo, but notice is still requiredYou, including any damage caused by projecting footings

Projecting footings

If you build a wall wholly on your own land, Section 1 gives you the right to place projecting footings and foundations under your neighbour's land, where that's necessary. You pay for this and must compensate your neighbour for any damage. Reinforced concrete foundations under the neighbour's land need their written consent.

What your notice must include

  • Your name and address as building owner, and the address of the property
  • A description of the wall you intend to build
  • Whether it will be astride the boundary or wholly on your land
  • The date you intend to start work, at least one month after service

Section 1 often goes hand in hand with a Section 6 excavation notice, because new foundations next to the boundary are usually deeper than the neighbour's. We check both.

Common questions

Does a timber fence count under Section 1?

No. The Act deals with walls. A timber fence along the boundary isn't covered, although replacing a fence with a masonry wall on the boundary would be.

Can I build up to the boundary without my neighbour agreeing?

Yes, if the wall is wholly on your own land. You still need to serve notice at least one month before starting. Only a wall astride the boundary needs consent.

Do I need planning permission as well?

Possibly. The Party Wall Act is separate from planning and building regulations. Having one doesn't remove the need for the others.

Source: Party Wall etc. Act 1996 (applies in England and Wales).

Written by Guy Crouch BSc (Hons) MRICS, Director and Chartered Building Surveyor at Manchester Party Wall Surveyors. Last reviewed 3 November 2026. This page is general guidance, not legal advice. About our team